Incentives that Can Add to the Economic Equation

ComEd CHP Project Incentives

Primary Energy is an approved ComEd CHP Energy Efficiency Service Provider for assisting qualifying customers with conducting the initial evaluation and gaining approvals for applicable incentives. Primary Energy is uniquely qualified to provide, not only the initial technical evaluation services, but also has the capabilities to support project implementation, financing, commissioning and even be the CHP facility operator should that be the client’s preference. Our advantage over other ComEd CHP Energy Efficiency Service Providers is that we have significant CHP construction and operating experience.

CHP Evaluation and Client Support Team

Primary Energy and has a strategic partnership with Chicago based Power Engineers Collaborative (PEC). PEC provides the technical support required to perform the initial feasibility study to identify incentive potential and confirm that the CHP project meets the benefits outlined in the feasibility study.

Learn more about PEC via the following link to their website: http://www.pecllc.com/

ComEd CHP Feasibility Study – Incentive Eligibility

Eligible Customers

  • Current ComEd Delivery Customer
  • Not a designated >10 MW customer
  • Facility Peak Demand ≥ 500 kW for both feasibility study and production incentives
  • Nicor Gas, Peoples Gas or North Shore Gas customer

 

Other considerations

  • Peak Demand < 500 kW still eligible for custom incentives
  • All projects must meet ComEd cost-effectiveness requirements

Feasibility Incentives – Overview

CHP feasibility study and projects must be pre-approved

  • Feasibility study incentive up to $10,000 for CHP projects< 400 kW
  • Feasibility study incentive up to $25,000 for CHP projects >=400 kW

Production Incentives – Overview

A production incentive of $0.07 per kWh is available for qualifying customers for the first year of operation

Prepayment of $60 / kW available upon successful COD

  • Receipt of commissioning documents which confirm construction completion, capacity and efficiencies of the project

Remaining incentive funds will be distributed upon the completion of 12 months of operation with associated performance measurement and verification

CHP Production Incentives Application Process

Step 1) Submit pre-approval application with requested documentation

Step 2) Receive approval and reservation letter from ComEd

Step 3) Purchase and install new or refurbished CHP equipment

Step 4) Measure energy production of newly installed or refurbished CHP system for 12 months

Step 5) Submit final application and supporting documentation for incentive

Qualifying Facilities for CHP Feasibility Studies

CHP feasibility studies must encompass one of the following:

  • The viability of a new topping or bottoming cycle CHP installation
  • The rehabilitation of an existing system that has been idle/not operational for at least 3 years
  • Installing heat recovery equipment on an existing engine or combustion turbine system
  • An existing engine or combustion turbine system that is not presently outfitted with heat recovery capability that can be converted to a CHP system
    • Conventional or topping cycle CHP systems must have annual fuel use efficiencies of at least 60 percent Higher Heating Value (HHV) with at least 20 percent of the system’s total useful energy output in the form of useful thermal energy.
    • These systems will have a net zero annual export of power to the grid.
    • All conventional CHP systems must have heat recovery capability.

Why Primary Energy is the Preferred CHP Organization to Partner With

Primary Energy owns and operates five (5) clean and efficient “behind the meter” energy facilities with a total capacity of approximately 300 MW’s

  • Projects are on or near the customer’s site
  • These projects are critical to the operations making the manufacturing facility more competitive
  • Twenty (20) years of operating experience with industrial manufacturing energy projects
  • Delivering reliable electricity, steam or heated/treated water critical to the manufacturing facility
  • The benefits include supplying cost efficient reliable energy (electric and steam) and achieving environmental compliance with zero violations
  • Maintaining the highest level of plant safety performance and safe work environment is one of our core values
  • Focus on enhancement solutions for our existing customers

For more information about the ComEd Energy Efficiency Program & Incentives click here: CHP Fact Sheet

Explore Primary Energy

Home
Industrial Power
Energy Recycling
Project Dashboard
Management
News
Contact Us

Footer

facebook linkedin

2929 Carlson Drive, Suite 301 • Hammond, Indiana 46323 • United States of America | 630-230-1313 | info@primaryenergy.com

©2018 Primary Energy | Legal | Privacy